Reconstruction of the substation PS35/10 kW in Kherson Installation of 35 kW pylon foundations by the highway M143 Odessa-Melitopol Installation of the mobile phone operator tower in the vill. Novopetrivka, Vysokopilsky District The 1st brigade crew prepares for a departure to a construction site A 26-meter pylon for a cell operator tower Installation of a AC-95 VL -10 KW cable from the 35/10 substation to the farming household at the vill, Golaya Pristan A 35 kV high voltage transmission line to a transformer substation of a mineral waters production plant A 35kV transformer substation of the mineral waters production plant Lightning conductor towers at the territory of the oil pipeline complex An electric circuits substation in the vill. Brylievka, Tsuriupnsky District A 10 kV high voltage transmission line to a mobile communications operator tower A 0.4 kV high voltage transmission line in the vill. Klyny, Tsuriupnsky District
|
|
|
All rights reserved
© 2007 SMMC-33 |